Concrete & masonry
Concrete Calculator
Estimate ready-mix cubic yards, bag quantities, waste, and cost for slabs, footings, and round columns.
Estimated order quantity
0.00 cubic yards
Planning estimate only. Verify product specifications, site conditions, and supplier purchase increments before ordering.
How the concrete estimate works
Volume is calculated from the slab, footing, or round-column dimensions, converted to cubic yards, and increased by the selected waste allowance. Bag counts use approximate yields of 0.60 ft³ for an 80 lb bag, 0.45 ft³ for a 60 lb bag, and 0.375 ft³ for a 50 lb bag.
Ordering guidance
Ready-mix suppliers often have minimum loads and may sell in quarter-yard increments. Bag yield varies by manufacturer and mix. Confirm the selected product’s stated yield before purchase.
Example
A 10 ft × 10 ft slab at 4 inches thick is about 1.23 yd³ before waste. With 10% added, plan for approximately 1.36 yd³.